Projects

Our Results

We pride ourselves on delivering results-focused outcomes for our clients across each of our services. Regardless of project size, location or industry, our ability to solve problems and add value has been consistently proven.

4195+

Total projects completed over our 5 years in business.

$184M+

Saved in possible project clashes, delays or damage.

107TB +

Survey data captured and stored on our servers.

Filter projects by topic

Services
Subservices
  • Subsurface Utilities
  • Civil Construction
Alinga Station
Canberra Light Rail Stage 2A

Comprehensive condition assessment, including CCTV investigations and dilapidation surveys, for 2km of road in the heart of Canberra. Astrea was responsible for detailed documentation of stormwater and sewer assets in preparation for utility relocation.

View Project
  • Subsurface Utilities
  • Surveying
  • Digital and Spatial
SINSW Passfield Park Media Release
School Infrastructure NSW

Over the last 2 years, Astrea has delivered close to 60 projects for School Infrastructure NSW. The comprehensive scope of works has consisted of the following: detailed topographic surveys, subsurface utility mapping, building modelling and floor plans and elevations,...

View Project
  • Subsurface Utilities
  • Civil Construction
M36aeq
M1 Motorway Extension to Raymond Terrace

Provision of utility mapping, non-destructive excavation and minor civil works for Design and Construct JV. The project encompassed the full 10-kilometre southern package of the M1 Pacific Motorway extension between Black Hill and Tomago.

View Project
  • Subsurface Utilities
  • Surveying
  • Civil Construction
9a4cba102f51ff7455bcdb3969408c1d 21 28 Parsley Bay Amenities View 02 211202
Refresh Vaucluse and Diamond Bay

Providing a complete suite of solutions for the construction of a new wastewater pump station and pressure pipeline in Parsley Bay. Civil works included the excavation of trenches, installation and pressure testing of watermain pipes and associated backfill/restoration of...

View Project
  • Subsurface Utilities
PHOTO 2024 04 29 11 33 36 2
Sydney Metro Southwest

QL-A subsurface utility data for 15 road-over-rail bridges between Sydenham and Bankstown, as the line undergoes conversion to Sydney Metro standards. Integrated solutions included NND, concrete scanning, CCTV investigations and asphalt core sampling.

View Project
  • Subsurface Utilities
  • Surveying
Tf NSW Hazelbrook 214 HR
Transport Access Program 3

The Transport Access Program (TAP) is a NSW Government initiative delivering safe, modern and accessible public transport infrastructure across the state. Astrea have provided utility mapping and non-destructive excavation services for a wide range of public transport...

View Project
  • Subsurface Utilities
  • Surveying
  • Civil Construction
1917 000255 Hi Res 2000x1333
Sydney Metro Northwest URC Drinking Water Package

As the population of Sydney's Northwest continues to grow and becomes more accessible due to Sydney Metro development, Astrea have provided utility mapping, surveying and civil construction services for Sydney Water as they comission a new drinking water package for the...

View Project
  • Subsurface Utilities
  • Surveying
Shutterstock 688629013 65f234f87a6fb529050480
Sydney Roads Asset Performance - River Zone

Astrea has been responsible for the provision of utility mapping and NDD services as part of a scope of works to deliver critical road maintenance and capital projects across the River Zone (Fulton Hogan).

View Project
  • Subsurface Utilities
  • Surveying
R23 0 4624 3067 w4647 h3098 fmax
HMAS Albatross Upgrade

Astrea have conducted detailed utility investigations and surveys for the major airfield upgrade at HMAS Albatross near Nowra. Scope of works has included utility mapping, surveying and non-destructive excavation for the ongoing works at the naval air base.

View Project