We pride ourselves on delivering results-focused outcomes for our clients across each of our services. Regardless of project size, location or industry, our ability to solve problems and add value has been consistently proven.
Total projects completed over our 5 years in business.
Saved in possible project clashes, delays or damage.
Survey data captured and stored on our servers.
Comprehensive condition assessment, including CCTV investigations and dilapidation surveys, for 2km of road in the heart of Canberra. Astrea was responsible for detailed documentation of stormwater and sewer assets in preparation for utility relocation.
Over the last 2 years, Astrea has delivered close to 60 projects for School Infrastructure NSW. The comprehensive scope of works has consisted of the following: detailed topographic surveys, subsurface utility mapping, building modelling and floor plans and elevations,...
Provision of utility mapping, non-destructive excavation and minor civil works for Design and Construct JV. The project encompassed the full 10-kilometre southern package of the M1 Pacific Motorway extension between Black Hill and Tomago.
As part of their ongoing store renewals, Coles Group have engaged Astrea on over 25 laser scan to Revit model projects for survey grade as-built documentation of existing store configurations. The program has included a range of store locations across NSW and interstate.
Providing a complete suite of solutions for the construction of a new wastewater pump station and pressure pipeline in Parsley Bay. Civil works included the excavation of trenches, installation and pressure testing of watermain pipes and associated backfill/restoration of...
Highly complex survey and subdivision of a 36,000 sqm retail complex in the centre of Warrawong. Astrea were engaged from project conception through to delivery, providing detail and level surveys, as-built 3D modelling and a strata plan of subdivision for the large...
QL-A subsurface utility data for 15 road-over-rail bridges between Sydenham and Bankstown, as the line undergoes conversion to Sydney Metro standards. Integrated solutions included NND, concrete scanning, CCTV investigations and asphalt core sampling.
Astrea was responsible for the delivery of key pipework and associated mechanical components involved in the upgrade of West Camden WRP. This included the installation of above ground double containment pipes in addition to the supply and installation of reclaimed...
The Transport Access Program (TAP) is a NSW Government initiative delivering safe, modern and accessible public transport infrastructure across the state. Astrea have provided utility mapping and non-destructive excavation services for a wide range of public transport...
As the population of Sydney's Northwest continues to grow and becomes more accessible due to Sydney Metro development, Astrea have provided utility mapping, surveying and civil construction services for Sydney Water as they comission a new drinking water package for the...
Full digital reproduction of the Drummoyne Presbyterian Church and it's surrounds, inclusive of detailed site surveys, laser scanning and BIM modelling. The digital twin was produced to form the basis of new renovation designs.
Astrea has been responsible for the provision of utility mapping and NDD services as part of a scope of works to deliver critical road maintenance and capital projects across the River Zone (Fulton Hogan).
Astrea have conducted detailed utility investigations and surveys for the major airfield upgrade at HMAS Albatross near Nowra. Scope of works has included utility mapping, surveying and non-destructive excavation for the ongoing works at the naval air base.
As part of the Prospect Water Filtration Plant Dam relining project for SUEZ in New South Wales, Astrea were engaged to undertake the enabling works package to supply and install: Office Compound areas including DGB20 hardstands; Material laydown areas with DGB20...